Contents: Removal ⇩ Installation ⇩
Removal
1. Disconnect the ground wire from the battery.
For more information, refer to the chapter: Disconnecting and connecting the battery (414-01 Battery, Battery Mounting and Cables, General Procedures).
2. Remove the hood.
For more information, see the chapter: Hood (501-02 Front body panels, Removal and installation).
3. Remove the upper cooling fan shroud. Release the 6 clips.

4. Remove the air cleaner outlet pipe.
For more information, refer to the chapter: Air cleaner outlet pipe (303-12 Distribution and filtration of intake air - Diesel engine ID4 2.4L, Removal and installation).
5. Unscrew the nut of the right engine support.

6. Disconnect the charge air cooler outlet hose. Loosen the clamp.

7. Unscrew the left engine support nut.

8. Using a suitable hydraulic jack, raise the engine a maximum of 45 mm.

9. Remove the left engine mount. Remove the two bolts.

Installation
1. Install the elements in place in the reverse order. Tighten (tightening torque 80 Nm).

2. Tighten (tightening torque 80 Nm).

3. Tighten (tightening torque 3 Nm).

[The material was taken from the specified website: LRman.ru]
4. Tighten (tightening torque 80 Nm).

5. Connect the ground wire to the battery.
For more information, refer to the chapter: Connecting the Battery (414-01 Battery, Battery Mounting and Cables, General Procedures).
Comments on this article