GENERAL INFORMATION, Precautions when working with electrical equipment.
Dismantling
1. Put the car on a lift.
2. Disconnect "negative" battery terminal.
3. Remove a transmission with a distributing box.
AUTOMATIC TRANSMISSION - ZF 5HP24, REPAIR WORKS, Automatic transmission complete with transfer case - removal and installation.
4. Install ring gear retainer LRT-12-219.
5. Turn away 9 bolts of fastening of a leading disk to a cranked shaft.
6. Remove torque converter drive plate with retainer LRT 12-219.
Assembly
1. Clean the threaded sockets in the body of the crankshaft, wipe the drive plate locating pin.
2. Wipe mating surfaces of torque converter and drive plate.
3. Install the drive plate on the crankshaft, install the LRT 12-219 retainer.
4. Screw in new bolts of fastening of a leading disk to a cranked shaft and consistently tighten them the moment of 120 Н·м.
5. Remove retainer LRT-12-219 from ring gear.
6. Install the gearbox with transfer case.
AUTOMATIC TRANSMISSION - ZF 5HP24, REPAIR WORKS, Automatic transmission complete with transfer case - removal and installation.
7. Attach "negative" battery terminal.
Comments on this article