2. Disconnect the traction from the bridge.
3. Remove the rod.
4. Press out the rubber bushings of the tie rod joints.

5. Press in new bushings.
Caution: Apply pressing force to the outer metal band of the bushing.
6. Install the rod into place. Tightening torque of threaded connections: 88 Nm.
Comments on this article