2.
NOTE: Before removing the cables, the gear must be in neutral; this will ensure proper cable routing during assembly.
3.
4.
Installation
1. Install the shift lever. Tightening torque: 10 Nm
2. Fasten selector cables.
3. Connect the ball joints of the selector cable.
4. Disconnect the left cable clamp.
5. Let the shift lever stop in neutral.
6. Secure the selector cable clip without changing the position of the gear selector.
7. Install the floor console. Refer to Procedure: Floor Console (501-12 Instrument panel and console, Removal and installation).
Comments on this article